| Australia Pacific LNG Project Floating Baffle
|
|
|
| Project Overview : |
| Date: |
August, 2011 |
| Location: |
Spring Gully, Queensland, Australia |
| Project Purpose: |
To supply, deliver and install floating baffle system to increase retention times within the brine pond.
|
| Features Summary : |
| Boom length: |
150 meters
|
| Boom material: |
UV Resistant 900gsm PVC |
| Float: |
Closed Cell PE Foam |
| Ballast: |
8mm Galvanised chain |
| Connectors: |
Universal connectors |
| Project Summary : |
- Spring Gully is a coal seam gas processing facility operated by Origin Energy Australia
- Water extracted from the coal seams during the drilling process is not immediately useable due its salt content. To combat this problem, the water is treated at a reverse osmosis plant which separates the water into a concentrated brine and a usable clean water stream which can be used for industrial and construction purposes, for irrigation and to supplement environmental flows in local rivers.
- The installed floating baffle will increase the retention time of this brine within ponds allowing for enhanced treatment
|
|
|
|
| |
|
|
|
|