| Project Overview : |
| Date: |
September, 2009 |
| Location: |
Melbourne, Victoria, Australia |
| Project Purpose: |
To custom design and manufacture a portable containment bund to contain leaking transformers in the field or at depots |
| Features Summary : |
| Materials used: |
Heavy duty XR5 geomembrane |
| Bund dimensions: |
12.5m long x 4.0m wide x 0.5m high |
| Capacity: |
50,000L |
| Project Summary : |
- Custom designed and manufactured to meet Jemena's specific requirements
- Bunds are designed so they are simple to erect, pull down and store
- Compact storage size suitable for transportation
- Bunds can be dropped to allow vehicle access
|
|
|
|
| |
|
|
|
|