Project Overview :
Date: January, 2010
Location: Narrung, South Australia, Australia
Project Purpose: To manufacture 2.8km aquatic curtain to contain large scale silt and sediment migration due to dredging operations during the Narrung Narrows project.
Features Summary :
Boom length: 2.8km total length at 15m length per boom
Boom depth: 2.5m geotextile skirt
Material: 680gsm PVC
Float: Closed Cell PE Foam
Ballast: 6mm Galvanised chain
Connectors: Universal connectors with toggle pins
Project Summary :
  • A environmentally sensitive project requiring aquatic curtain for rapid deployment and manufactured in a very short amount of time
  • Project was a success with the client winning a CCF award